Skip to product information
1 of 4

34.5cm Elegant Non Stick Tawa / Griddle

34.5cm Elegant Non Stick Tawa / Griddle

Regular price Rs.3,550.00
Regular price Rs.4,943.00 Sale price Rs.3,550.00
Sold out
Shipping calculated at checkout.
20 people are viewing this right now
size

Shipping & Returns

Unused products are eligible for return within 2 weeks according to the applicable return policy.

Orders are estimated to be delivered within 4 to 6 working days after order confirmation.

Materials

Made from 99.99% Pure Aluminum for reliable heat distribution and lasting durability. Sonex is an ISO-certified brand committed to quality manufacturing.

Features a 100% Food-Grade, PFOA-Free 3-Layer Nonstick Marble Coating for easy food release and effortless cleaning.

Care Instructions

To help maintain the nonstick coating, use wooden, silicone, or nylon utensils and cook on low to medium heat. Wash the pan with a soft sponge and mild dishwashing liquid after it has cooled, and avoid using metal utensils, abrasive cleaners, or overheating the empty pan.

View full product details

The Elegant Tawa is a larger, stylish tawa for bigger rotis and parathas. The wider surface lets you cook faster for a family of four to six.

Features

  • Larger 34.5 cm cooking surface
  • Slightly deeper (2.5 cm) design
  • Non-stick coating for healthier, low-oil cooking
  • Stylish look with a heat-resistant handle

Specifications

Diameter

Depth

Capacity

Net Weight

34.5 cm

2.5 cm

1.0 L

1.43 kg

 

Precautions: Use wooden or silicone utensils only. Do not heat empty on high flame. Cool before washing. Avoid overheating, metal utensils, abrasive cleaners and sudden temperature changes. Follow the manufacturer’s care instructions to keep the coating performing well.

Why choose Sonex

ISO Certified

Trusted by 1 Crore+ Families

Made in Pakistan

Serving for 76 Years

FAQS